Skip to content
Call a plumber(365) 414-5810
Exposed brass shower valve on a white tile wall
Exposed brass shower valve on a white tile wall

Renovations

Bathroom Plumbing Renovation in Markham

In a bathroom renovation, the plumbing is the part you cannot change after the tile goes on. We plan it with you first, rough it in properly, and come back to set fixtures once the finishers are done.

  • Cartridges, seats and aerators matched to your make
  • New braided supply lines on every install
  • Silicone and caulk lines finished cleanly
  • Leak test under the counter before we pack up
Phone answered by a plumber(365) 414-5810
  • Licensed trade work
  • Homes & businesses
  • Same-day visits when possible
  • Markham & York Region

Planning before demolition

Moving a toilet a few centimetres or switching a tub for a walk-in shower changes drain slopes and venting. In two-storey Markham homes, the floor joists under an upstairs bathroom limit where drains can run. We look at the joists, the stack location and the space below before you commit to a layout.

  • Fixture positions and the drain path for each.
  • Shower valve height, niche locations and any body sprays.
  • Whether a curbless shower needs the floor recessed.
  • Access to shut-offs once the room is finished.

Rough-in stage

  1. Old fixtures and piping are removed back to sound connections.
  2. Drains are cut in or relocated with correct slope and venting.
  3. Supply lines are run to each fixture, with blocking for shower valves.
  4. The shower valve body is set at the right depth for the wall finish.
  5. The rough-in is tested and, where a permit is held, inspected before walls close.
Shower valves are depth-sensitive. A valve set too deep or too shallow for the tile thickness leaves a trim that does not seal to the wall. Tell us the full wall build-up before we set it.

Riding along on the truck

  • Basin wrench for nuts behind the sink bowl.
  • Cartridge pullers and seat tools for common brands.
  • Braided supply lines and new angle stops.
  • Plumber's putty and silicone for drains and escutcheons.
  • Access panel cutter for shower valve bodies.

Finish stage

After tile and paint, we return to fit the toilet, vanity faucet and drain, shower trim and any tub filler. Every fixture is run and checked under the vanity and behind access panels.

ChangePlumbing impact
Tub to showerLarger drain, new valve location, waterproofing
Single to double vanitySecond drain and supplies
Freestanding tubFloor drain and floor-mounted filler
Toilet movedNew flange location and drain route

Permits

Changing drains or adding fixtures often requires a plumbing permit in Markham. Read when plumbing needs a permit. Valve trouble in an existing shower is covered on shower valve repair.

Markham note: village-core houses tend to hide cast iron and galvanized behind plaster, while Cornell and Box Grove builds run PEX to a manifold. We ask the year your house was built so the right fittings ride along on the truck.

Straight from the phone log

Do you do the tiling?

No. We handle the plumbing and coordinate with your contractor or tiler on timing and valve depth.

Is the original bathtub salvageable?

Frequently. We cover it with cardboard and blankets during the job and replace only the drain and overflow if they are worn.

Ready to get it fixed?

One call, a clear explanation, and work finished tidily before we leave.

Call (365) 414-5810